JICA報告書PDF版(JICA Report PDF)
橋梁工学
Bridge engineering
ボツワナ
Botswana
書名
(Title)
出版者
(Publisher)
刊行年月
(Published year/month)
ボツワナ・ザンビア国 ザンベジ川カズングラ橋建設計画事前調査報告書. -
国際協力事業団
2000.6
ボツワナ・ザンビア国 ザンベジ川カズングラ橋建設計画調査最終報告書 要約. -
国際協力事業団 : 日本工営 : オリエンタルコンサルタンツ
2001.3
The feasibility study on the proposed Kazungula Bridge over the Zambezi River between the Republic o f Botswana and the Republic of Zambia final report : summary. -
Japan International Cooperation Agency : Nippon Koei Co., Ltd. : Oriental Consultants Co., Ltd.
2001.3
The feasibility study on the proposed Kazungula Bridge over the Zambezi River between the Republic o f Botswana and the Republic of Zambia final report : main report. -
Japan International Cooperation Agency : Nippon Koei Co., Ltd. : Oriental Consultants Co., Ltd.
2001.3
The feasibility study on the proposed Kazungula Bridge over the Zambezi River between the Republic o f Botswana and the Republic of Zambia final report : appendices. -
Japan International Cooperation Agency : Nippon Koei Co., Ltd. : Oriental Consultants Co., Ltd.
2001.3
The feasibility study on the proposed Kazungula Bridge over the Zambezi River between the Republic o f Botswana and the Republic of Zambia final report : drawings. -
Japan International Cooperation Agency : Nippon Koei Co., Ltd. : Oriental Consultants Co., Ltd.
2001.3